IV. Internet · Chapter 36
Fiber Optic Buildout
The late 1990s saw an unprecedented build-out of core backbone Internet infrastructure. The long-haul fiber optic backbone builders—MCI, Qwest, Level 3, Global Crossing, Sprint, AT&T, and others—raised hundreds of billions during the boom to do the hard, physical, capital-intensive work of laying fiber optic cable. Crews with backhoes, bulldozers, and horizontal-boring machines carved trenches along railroad rights-of-way and highways. Offshore, cable-laying ships spooled thousands of kilometers of fiber onto the seabed, with divers or submersible plows burying it under sand and rock to protect it from anchors and fishing nets.
This was a grand-scale infrastructure project, not unlike the Transcontinental Railroad, the electrical grid, or the Interstate Highway System. But instead of unfolding over decades, as those earlier systems did, it was massively accelerated—compressed into just five or six years, with telecom companies deploying that capital in a short, furious burst of investment.
Unlike its predecessors, which relied heavily on public financing—the railroads subsidized by federal land grants, rural electrification driven by New Deal programs, and the Interstate entirely planned and funded by the federal government—the telecom boom was almost wholly private. In sheer scale, it rivaled or exceeded most of what came before it: the great railroad manias mobilized only a few billion 19th-century dollars (roughly $30–50 billion today), and the U.S. electrical grid absorbed on the order of a few hundred billion dollars (in today’s terms) spread gradually over more than half a century. Only the Interstate Highway System was larger—about $114 billion in 1950s dollars, or more than $500 billion today—but that investment unfolded over 35 years. The 1990s telecom surge, by contrast, was a frantic, market-driven race, financed through stock offerings and high-yield debt—compressed into “Internet time.”
This great fiber optic buildout of the 1990s could proceed on this gold-rush timeline because the science and engineering of fiber optics was already mature, the result of many decades of incubation. The use of light to transmit communications has a history going back to antiquity: Greek watchtowers relayed messages via signal fires, the Romans and Chinese used mirror signaling for similar purposes. In 1880, Alexander Graham Bell demonstrated a “photophone” that transmitted speech by modulating sunlight using a mirror, but its exquisite sensitivity to weather, atmospheric turbulence, and line-of-sight alignment made it impractical.
The basic scientific foundations of the laser—a critically important general purpose technology in its own right—go back to Einstein’s 1917 paper introducing stimulated emission. From the first working ruby laser in 1960, labs attempted photophone-like laser-based communications through the air, which did work but remained impractical due to weather and alignment challenges.
The breakthrough for fiber optics was the concept of guiding the laser light within glass. A core of higher-index glass, clad in lower-index glass, traps the light by total internal reflection—even around bends, if you respect a maximum bend radius. Early fibers were far too lossy to be practical. Charles Kao and George Hockham, in 1966, identified the culprit—impurities—and quantified the goal for practical long-distance communications: ultra-pure silica with loss below ~20 dB/km. Corning met that challenge in 1970, producing low-loss silica fiber with 16-17 dB/km loss, and, over the next decade, losses would be pushed down to ~0.2 dB/km.
With the glass purity problem solved, in the 1980s Bell Labs solved the “system” problems of making components to generate and receive the light, building and refining continuous-wave semiconductor lasers, optical detectors, and amplifiers. All of this science & technology accumulated in the great stockpile. By the early 1980s AT&T was deploying fiber optics for its long-distance voice backbone, though still in circuit-switched fashion, simply using fiber as a faster, lighter, higher capacity wire, giving each voice channel a fixed time slot in a repeating schedule (“time-division multiplexing” or TDM). By the time the need for mass deployment of fiber for the packet-switched Internet came, the technology was ready; all that was needed by that point was the capital and the will.
The great tubes of fiber-optic glass that made up the Internet’s infrastructure were every bit as physical as the iron rails of the steam era. The deployment of fiber for the Internet required immense logistical coordination and rugged equipment. Construction crews used heavy-duty rock saws and trenchers to cut paths for buried fiber along highway rights-of-way. In open plains, they employed plows, sometimes attached to trains, to rapidly lay conduit. In urban areas, laying fiber meant night trenching in city streets or threading cables through existing utility ducts. Crews had to contend with varied terrain—boring under riverbeds and blasting through mountain passes—much as railroad builders had to tunnel and bridge their way across the continent. It was physical, gritty work: backhoes digging trenches, reels of cable unwinding into pits, technicians splicing glass strands in trailer labs, and regenerator huts sprouting every 40–60 miles to amplify optical signals across the heartland.
Often, fiber cables were laid alongside railroad tracks, mirroring the paths of 19th-century railroads, just as telegraph cables once did; the iron rails and copper wire that bound the nation were now paralleled by glass threads carrying light. Qwest Communications was originally a railroad subsidiary, and it leveraged its old rail rights-of-way to lay fiber. It deployed a custom-built, 76-ton rail-mounted plow that could bury multiple conduits 4–5 feet deep alongside the tracks, laying about 8 miles of pipe per day. By mid-1999, Qwest had completed a 16,000-mile fiber-optic network reaching 125 U.S. cities and Mexico. This coast-to-coast network was built astonishingly fast—essentially in just a few years—and Qwest’s marketing proudly invited customers to “Ride the Light” on its new digital railroad. Sprint had also had its roots in the railroads, born from Southern Pacific Railroad internal telegraph network. Sprint had already built a national long-distance network, but continued to modernize and expand its fiber backbone in the 1990s, participating in major intercity routes.
Level 3 Communications was a startup backed by construction giant Kiewit, which endeavored to be the low-cost bandwidth provider by building differently. As it constructed its nationwide backbone in the late ’90s, Level 3 didn’t just lay one or two conduits—it buried 12 empty conduits alongside its fibers, anticipating easy expansion in the future. The idea was that new fiber could later be blown through these spare ducts at a fraction of the cost of digging new trenches. By January 2001, Level 3 had finished its own 16,000-mile U.S. fiber network and was serving 60+ cities across the U.S. and Europe. Level 3 alone spent over $10 billion on construction by 2001, an extraordinary sum for a newly founded carrier.
From 1998–2001, Global Crossing’s cable-laying ships zigzagged across oceans, unspooling thousands of miles of fiber-optic cable along the seafloor. The company spent nearly $15 billion in five years to construct “the most far-reaching and up-to-date fiber network in the world,” spanning 100,000 miles and 27 countries. Global Crossing wasn’t alone. Other consortia and firms—FLAG, Level 3, 360networks, Tyco, MCI/WorldCom, Sprint, AT&T and more—all participated in the submarine cable boom. Since 1995, the world has added nearly a million miles of undersea fiber cables—enough to wrap around Earth about 40 times.
Laying a submarine cable is a remarkable fusion of high-tech engineering and blue-water seamanship. The work begins long before a ship leaves port: survey teams map the seabed in painstaking detail to chart a route that avoids undersea volcanoes, reefs, earthquake faults, steep ridges, strong currents, and even whale migration paths.
The cable itself is deceptively slim—only 3–7 cm in diameter, about the thickness of a garden hose—yet engineered for the deep ocean. Inside sit hair-thin glass fibers wrapped in insulation, copper conductors to power repeaters, steel armor, and waterproof jacketing. Near shore, where anchors and trawlers are a constant threat, the armor thickens—sometimes to several layers—to withstand abrasion, impact, and even the occasional curious shark.
Specialized cable-laying ships carry thousands of kilometers of this cable coiled in giant tanks below deck. Guided by GPS and the earlier surveys, the crew feeds the cable out in a controlled descent. In deep water—sometimes miles down—it simply settles on the seabed, held in place by its own weight and the calm of the abyss. Closer to shore, where the hazards multiply, an underwater plow or remotely operated vehicle (ROV) carves a narrow trench and buries the cable a meter or two below the surface. The vessel creeps forward at roughly 10–12 kilometers per day, with crews constantly monitoring tension and position; even a minor snag can be costly, so the cable is laid with near “jewel-like precision” to avoid it ever catching on an undersea ridge.
Every 50–100 kilometers, the line incorporates a hermetically sealed optical repeater—a cylindrical amplifier that boosts the light signal so it can travel thousands of kilometers without degrading. Each repeater must work flawlessly for decades in a place no human can reach without mobilizing another ship, making their placement and testing among the most exacting steps in the entire operation.
Near shore, the operation turns delicate. Small boats and divers shepherd the cable through the shallows, easing it around rocks or coral before pulling it onto the beach and threading it into a buried conduit. The landing is a celebratory moment—teams often photograph the big cable coming out of the surf like a sea serpent, with hard-hatted engineers and sometimes local dignitaries on the beach present to witness the newest strand in the world’s communications web coming ashore.
In the face of this roaring, capital-fueled expansion of packet-switched fiber, the old telephony infrastructure increasingly looked out of step with the future. After years of resistance, AT&T, like every other telecom, was ultimately compelled to adopt packet-oriented technologies in its backbone rather than relying purely on circuit-switched links. This shift was incremental and hedged; AT&T did not capitulate in a single moment, but gradually shifted with the rest of the industry towards IP-based telephony and packet switching infrastructure. Even into the 2000s, a large share of its traffic, especially voice, still was carried over circuit-switched paths, and many services such as leased lines and T1s relied on circuit paradigms. For years, AT&T ran hybrid networks: packet cores interfacing with legacy circuit trunks, and gateways translating between IP voice and TDM (time-division multiplexing) telephony.
Over time, as capacity, demand, and cost economics shifted, AT&T deployed newer packet-based subsystems alongside the old, then gradually migrated more traffic onto them. The pattern was exactly the same as the way telephone infrastructure gradually subsumed telegraph infrastructure: voice became just another type of packetized data. Essentially all modern voice traffic is now carried via packets, marking the absolute triumph of the packet-switching concept.